精品无码人妻一区二区,久久伊人精品波多野结衣 ,国产国拍亚洲精品A∨一级,国产精品久久久久久无码,亚洲无码a∨在线观看,亚洲av乱码专区国产乱码

Company dynamics
Your location : Home > News > Company dynamics

Vapor-liquid two-phase flow is used in continuous sewage expansion vessel

time:2021-08-20 09:21:27Views:

Lianyungang Lingdong Electromechanical Equipment Co., Ltd. is a manufacturer of gas-liquid two-phase flow and electric auxiliary equipment such as continuous discharge expansion vessels. The agreement is applicable to the self-adjusting liquid level controller of the gas-liquid two-phase flow of the N125 continuous discharge expansion vessel in a thermal power plant. It proposes technical requirements in terms of energy and experimentation. This agreement proposes minimum technical requirements, and the supplier provides gas-liquid two-phase flow manufacturing and corresponding services that comply with the requirements of this agreement and industrial standards. If the demand party has any special requirements other than this agreement, they shall be proposed in writing and agreed upon by both the supply and demand parties. This technical agreement, as an attachment to the purchase contract, has the same legal force as the main text of the contract.


我手機(jī)圖片 419.jpg


2. Design parameters


2.1 It is a self regulating liquid level controller for continuous discharge of gas-liquid two-phase flow


Hydrophobic capacity: 6t/h


Hydrophobic temperature; 170 ℃


Positive pressure: 0.6~0.8MPa


(Steam side pressure below -: 0.2MPa)


Drain pipe diameter: Ф 89 mm


我手機(jī)圖片 418.jpg


2.2 The second continuous discharge uses a steam liquid two-phase flow self regulating liquid level controller


Hydrophobic capacity: 6t/h


Hydrophobic temperature; 110 ℃


Positive pressure: 0.2~0.3MPa


(Steam side pressure below -: 0.05MPa)


Drain pipe diameter: Ф 89 mm


3. Specifications and standards for gas-liquid two-phase flow in equipment


The supplier shall design and manufacture according to the standards of gas-liquid two-phase flow and industry standards.


4. Technical requirements for gas-liquid two-phase flow


4.1 The continuous drainage flow rate can be fully automatically adjusted within the range of 6t/h ± 50%.


4.2 Spray nozzle material: 1Cr18Ni9Ti


我手機(jī)圖片 420.jpg


5. Other requirements for gas-liquid two-phase flow


5.1 All gas-liquid two-phase flow outer surfaces should be treated with appropriate methods and painted. The primer should be applied before the equipment rusts, and the surface paint should be applied after the primer is dry.


5.2 Transportation and storage measures for gas-liquid two-phase flow


The gas-liquid two-phase flow must be completely dry during transportation, and all openings and flange interfaces must be protected to prevent damage, corrosion, or entry of impurities.


6. Supply scope of gas-liquid two-phase flow


Item Name Model Specification Unit Quantity Remarks


1. Self regulating liquid level controller


(Supporting signal regulator) SWQ-IV (80) units 2


(Equipped with interface counter flanges and fasteners)


2 Self regulating liquid level controller


(Supporting signal regulator) SWQ-IV (80) units 2


(Equipped with interface counter flanges and fasteners)


你可能喜歡看:

產(chǎn)品動(dòng)態(tài)

Vapor-liquid two-phase flow is used in continuous sewage expansion vessel生產(chǎn)廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

鲁山县| 贞丰县| 广元市| 革吉县| 庆元县| 阿克苏市| 林甸县| 北安市| 望都县| 清河县| 武宣县| 油尖旺区| 成安县| 华阴市| 柳林县| 杭锦旗|